?Tell the framer to verify the ____ of the vaulted ceiling at the job site.

A. ?height
B. ?shape
C. ?size
D. ?structure


Answer: A

Trades & Technology

You might also like to view...

In a plug-type burn repair, the new piece of board is installed in the hole, and a(n) ____________________ is taped or clamped to the board.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

The size and spacing of the rafters are specified in Tables R802.5.1 through R802.5.8 of the ____ CodeĀ®.

A. National Builders B. National Fire Protection C. International Residential D. International Roofing

Trades & Technology

Calculate the force, pressure, or area problems, as indicated.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

To connect an attachment to a three-point hitch, set the rockshaft or hitch control lever to the _____

a. position of the draft links b. intermediate position c. minimum position d. maximum position

Trades & Technology