When terminating a GTAW weld, the crater must be filled to the full cross section of the weld to prevent
_____.
a. cracking
b. overfill
c. melt-through
d. root fusion
a
You might also like to view...
To phase shift an SCR, the gate circuit must be unlocked, or separated, from the anode circuit.
Answer the following statement true (T) or false (F)
Veterinary technology tends to lag far behind human medical technology
Indicate whether the statement is true or false
Technician A uses a double angle inboard-outboard mount when mounting a fifth wheel assembly that has no mounting plate. Technician B welds fifth wheel deck plate assemblies to the frame mounting angle iron. Who is correct?
A. Technician A B. Technician B C. Both A and B D. Neither A nor B
Which statement regarding the checking process is correct?
A. The checking process is complete after checkprint #1 changes have been incorporated into the drawings. B. Only the final checkprint is kept on file for each job to prevent confusion of having multiple copies. C. The checkprint is given to the originator for additional comments before it is returned to the CAD team. D. In the checking process, corrections may be written on a hard copy or may be added electronically.