What should the technician do when replacing stabilizer bar links?

A) The stabilizer bar must be compressed using a special tool before removing or installing stabilizer bar links
B) The links can be replaced individually, yet the manufacturer often recommends that the links at both ends be replaced together
C) The stabilizer bar should be removed from the vehicle before replacing the links
D) Both A and C are correct


B

Trades & Technology

You might also like to view...

All substances that plants are grown in are called media

Indicate whether the statement is true or false.

Trades & Technology

Technician Asays when testing, the ground side, voltage drop should be less than 0.2 volt. Technician B says the total insulated system drops should be less than 0.7 volt. Who is correct?

A. Technician A only B. Technician B only C. Both Technician A and B D. Neither Technician A nor B

Trades & Technology

____________________ is a rotational consideration, while positional tolerancing does not imply rotation.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

A CAT III certified DMM should be used whenever measuring high-voltage circuits or components. The CAT III rating relates to ________

A) High voltage B) High energy C) High electrical resistance D) Both A and B

Trades & Technology