Which of the following persons has the final authority to accept or reject faulty work?

A. the architect/engineer.
B. the foreman.
C. the inspector.
D. the superintendent.
E. the owner.


E

Trades & Technology

You might also like to view...

Consider the iron?nickel peritectic transformation in Fig. 11.18.

(a) What are the compositions and weight percentages of the phases just above the peritectic temperature (1512°C)? (b) Answer this same question with regard to a temperature just below the peritectic temperature.

Trades & Technology

Two technicians are discussing what could be the cause of slow cranking and excessive current draw. Technician A says that an engine mechanical fault could be the cause. Technician B says that the starter motor could be binding or defective. Who is right?

A) Technician A only B) Technician B only C) Both technicians D) Neither technician

Trades & Technology

Plumbing schedules provide specific information regarding:

A. plumbing equipment B. fixtures C. supplies D. all of the above E. none of the above

Trades & Technology

Discuss the purpose of using sample-and-hold circuits in data acquisition systems.

What will be an ideal response?

Trades & Technology