What type of information on prebid conferences is typically included in the Instructions to Bidders?

What will be an ideal response?


The type of information about prebid conferences that is typically included in the Instructions to the Bidders is the following:

a) The date and time
b) The location
c) Who needs to attend
d) Whether attendance is required

Trades & Technology

You might also like to view...

?Within the Uniform Drawing System, a ____ refers to a physical structure or group of structures serving one or more purpose.

A. ?facility B. ?project C. ?model D. ?drawing

Trades & Technology

Do an Internet search with “feedstocks for biodiesel” and find out at least three different feedstocks for biodiesel production.

What will be an ideal response?

Trades & Technology

One horsepower is equal to ________ watts

A) 500 B) 1050 C) 745 D) None of these

Trades & Technology

If a small sports car collides head-on with a massive truck, which vehicle experiences the greater impact force? Which vehicle experiences the greater acceleration due to the impact?

What will be an ideal response?

Trades & Technology