Imagine, the plug in the sink described in Problem 8.32 leaks. If it now takes 45 seconds to fill the sink to its rim, estimate the volumetric flow rate of the leak.

What will be an ideal response?




Trades & Technology

You might also like to view...

On a boiler the inlet line to the lower (drum)header is called the.

a. downcomer b. riser c. steam generating tube d. desuperheated tube

Trades & Technology

The solder most commonly used on low-pressure copper fittings is made from _____

a. 100% lead b. 50% tin/50% silver c. 95% tin/5% antimony d. 45% silver/25% zinc/30% copper

Trades & Technology

What specification designates a gauge with an accuracy of 3% for the first third of the scale, 2% for the middle third and 3% for the final third of their scale?

A) 3-2-2 B) 2-3 C) 2-3-2 D) 3-2-3

Trades & Technology

In the turbocharger compressor housing, what converts high velocity air into compressed air?

A. Compressor wheel. B. Turbine wheel. C. Restricted flow area. D. Intake manifold.

Trades & Technology