If an engineer does not want to have to write the general conditions of a construction contract where could standard general conditions be purchased?
What will be an ideal response?
Documents containing standard General Conditions could be purchased from organizations such as the Associated General Contractors, the Construction Management Association of America, the American Institute of Architects, and the Engineers Joint Contracts Documents Committee (EJCDC).
You might also like to view...
If a pipe heating cable outlet is installed in a manufactured home, the outlet shall be ____.
A. located within 1 ft of the cold water inlet B. located within 2 ft of the cold water inlet C. located within 3 ft of the cold water inlet D. located within 4 ft of the cold water inlet
Which one of the following is not true about cole crops?
A. the harvested parts are not the same for each crop B. members of the Brassicaceae family C. they are mostly warm season crops D. have flowers with 4 petals arranged like a cross
When the specific gravity of an electrolyte in a battery is high, ___________
a. The charge in the battery is low. b. The charge in the battery is high. c. It is impossible to tell the amount of charge the battery has from measuring its specific gravity.
A gate output is supposed to be HIGH. A digital probe indicator lamp is off. This could be caused by
A) a failed gate. B) a nonfunctional probe. C) improper gate input. D) all of the above