Precast concrete ____ obtain the information they need to prepare framing plans from architectural plans, engineers' sketches, or contractors' sketches.
A. CAD technicians
B. CAD managers
C. checkers
D. drafting clerks
Answer: A
You might also like to view...
In a single -span mullion system for a glass curtain wall, __________.
A) only one dead-load anchor is provided for the entire height of the wall. B) one dead-load anchor is provided at every floor level. C) two dead-load anchors are provided at every floor level. D) one dead-load anchor is provided at every alternate floor level. E) two dead-load anchors are provided at every alternate floor level.
High EGR flow results in undercalculation of the fuel and a lean air-fuel mixture, and low EGR flow drives the mixture rich.
Answer the following statement true (T) or false (F)
When the oil pressure drops to between 3 and 7 psi, the oil pressure lamp lights by _________
A) Grounding the circuit B) Opening the circuit C) Dropping the oil float level D) Resisting the circuit
92% of milk produced in the United States is what grade?
A. F B. B C. C D. A