Yonan Inc. is considering Projects S and L, whose cash flows are shown below. These projects are mutually exclusive, equally risky, and not repeatable. If the decision is made by choosing the project with the shorter payback, some value may be forgone. How much value will be lost in this instance? Note that under some conditions choosing projects on the basis of the shorter payback will not cause value to be lost. WACC:10.25% 0 1 2 3 4 CFS-$950 $500 $800 $0 $0 CFL-$2,100 $400 $800 $800 $1,000
A. $39.40
B. $33.11
C. $41.39
D. $28.47
E. $37.74
Answer: B
You might also like to view...
How should intangible assets be disclosed on the balance sheet?
a. As a reduction of stockholders' equity b. At cost in the current assets section c. at the estimated market value at the balance sheet date d. Net of the costs already amortized
Refer to the data on Expected Demand for Acme Widgets. For the various demand scenarios and their associated probabilities, which of the three decision alternatives has the maximum expected value?
A. outsource, with an expected value of $20.95 million
B. build capacity, with an expected value of $23.70 million
C. do nothing, with an expected value of $40.50 million
D. outsource, with an expected value of $31.60 million
What is the most common type of chart for showing the distribution of a numerical variable?
a. time series graph b. histogram c. bin d. box plot
Which of the following is true regarding the sampling distribution of the mean for a large sample size? Assume the population distribution is not normal
a. It has the same shape, mean and standard deviation as the population. b. It has the same mean as the population, but a different shape and standard deviation. c. It the same mean and standard deviation as the population, but a different shape. d. It has the same shape and mean as the population, but a different standard deviation.