An advantage of the RTM process is that ____. ?

A. ?it minimizes material waste
B. ?polymers may be reinforced
C. ?good finishes can be expected
D. ?there are fast cycle times for large products


Answer: A

Trades & Technology

You might also like to view...

By utilizing a strategy called demand control ventilation, DCV, the amount of outside air being brought into the building can be varied based on the actual occupancy level in the structure.

Answer the following statement true (T) or false (F)

Trades & Technology

Technician A says the load chain on chain hoists are case hardened to reduce wear. Technician B says that load chain on chain hoists are similar to other chains and can serve many purposes when removed from a chain hoist. Who is correct?

A. Technician A B. Technician B C. Both D. Neither

Trades & Technology

___________ is an example of a soluble or "quickly available" nitrogen source

a. IBDU b. Urea c. Ureaform d. Sulfur-coated urea

Trades & Technology

A thread pitch gauge is designed to measure the grade of a bolt.

Answer the following statement true (T) or false (F)

Trades & Technology