In steel construction, the structural steel members are brought to the construction site in precut lengths and connected together at the site according to the detail drawings. Who prepares the details of connections between the components?

What will be an ideal response?


A steel detailer prepares the details based on the design provided by the structural engineer (SE) of the project. The detailer's details must be approved by the project's SE.

Trades & Technology

You might also like to view...

The input or driving member of the converter is the ________.

A) Stator B) Impeller C) Turbine D) All of these

Trades & Technology

Which of the following is true of an automatic slack adjuster?

A. signals driver when brakes need adjusting B. automatically defines the amount of brake force required C. automatically sets the amount of hold-off chamber force D. adjusts brake free stroke as friction surfaces wear

Trades & Technology

In which document is the inspector most likely to find the requirements for the type of material required to be used in the work?

A. Plans. B. Specifications. C. Change Order. D. Bulletin.

Trades & Technology

What is one of the most important decisions to be made about cattle facilities?

a. loss c. weather b. profit d. location

Trades & Technology