A ____ is a forecast of construction costs prepared by the architect or designer during the design process to give the client an approximation of the expected cost to construct the building.
A. statement of completion cost
B. statement of all costs
C. statement of verified costs
D. statement of probable construction cost
Answer: D
You might also like to view...
Any nail driven inside a horse's white line will cause pain and result in lameness.
Answer the following statement true (T) or false (F)
Apple trees do best in cool climates
Indicate whether the statement is true or false
Technician A says a vehicles first road test after having a new engine installed is to help the rings to seal. Technician B says several wide-open throttle starts will help seal the rings. Who is correct?
A. Technician A B. Technician B C. Both A and B D. Neither A nor B
In a circuit with high resistance ________
A) No electrical device will function B) Electrical loads may still operate but less efficiently C) Both A and B D) Neither A nor B