Operation and maintenance manuals, warranties and guarantees, and a certificate of substantial completion are all considered part of the _____.
a. closeout documents
b. submittal package
c. instruction to bidders
d. form of agreemen
a. closeout documents
You might also like to view...
In a step-down transformer with a 4.16kV primary delta connection and a 480/277V wye secondary, the transformer turns ratio is _____.
a. 5:1 b. 9:1 c. 11:1 d. 15:1
Calculate the harvesting capacity of a combine using the following formula:
HC = (S ×W× EFF ×Y) ÷ 8:25 Where: HC is the harvesting capacity, bu/hr. S is the combine speed, mph. W is the combine harvesting width, ft. EFF is the harvesting efficiency of the field. Y is the yield, bu/acre.
Which of the following is NOT a feature of ControlNet network?
A) ControlNet is a sub-network off the DeviceNet network. B) PLCs use ControlNet scanner cards when added to the network. C) Devices attached to the network include operator interface terminals, remote I/O modules, motor drives and personal computers. D) Both coaxial and fiber optic cables are used to transmit data on the network.
Ego strength is the ability to undertake self-directed tasks and to cope with tense situations.