One complete set of plans _____.

a. is made for all contractors to share
b. is kept in the field office for reference
c. must be on site at all times
d. must be given to the building inspector


Answer: B

Trades & Technology

You might also like to view...

What are the two main disadvantages of layering?

What will be an ideal response?

Trades & Technology

Batteries should be charged in segregated areas designated just for battery charging.

In all furnace cabinet configurations, the return air:

A) Enters as combustion air, travels through the heat exchanger, and exits the fan end of the furnace. B) And combustion air enter the furnace through the same opening. C) Enters at the fan housing end and exits the heat exchanger end of the furnace. D) Enters at the heat exchanger end and exits the fan housing end of the furnace.

Trades & Technology

Although this is usually done at the factory or during proving, a typical commissioning procedure includes verifying that the instruments have been _____

A) zoned B) toned C) calibrated D) tuned

Trades & Technology