In addition to the risks shown in Figure 22.1, identify at least six other possible risks that could arise in software projects.
What will be an ideal response?
Other possible risks are:
Technology: Communications network saturates before expected transaction limit
is reached.
People: Level of skill of available people is lower than expected.
Organizational: Organizational changes mean that the project schedule is
accelerated.
Tools: Software tools cannot handle the volume of data available for large systems.
Requirements: New non-functional requirements are introduced that require
changes to the system architecture. Estimation: The difficult of the software
is underestimated.
You might also like to view...
Select the syntactically correct way to access a Public Shared class member.
a) className(sharedMemberName) b) sharedMemberName.className c) className.sharedMemberName d) sharedMemberName(className)
When invoking a method with an object argument, ___________ is passed.
a. the contents of the object b. a copy of the object c. the reference of the object d. the object is copied, then the reference of the copied object
This view is used when you want to display the data in a table or query in the form of a PivotTable:
A) Input. B) PivotTable. C) Datasheet. D) Design.
?In the accompanying figure of Microsoft PowerPoint 2016, Box A points to a _____ that is used to reposition an image in a slide.
A. ?sizing handle B. ?pointer C. ?placeholder D. ?trimmer