In field testing, the inspector should:

A. not be responsible for sampling.
B. take field samples to check on materials on the job.
C. ignore taking of samples, for it is up to the testing lab.
D. take samples only at the request of the contractor.


B

Trades & Technology

You might also like to view...

If the primary current is less than two amperes for a transformer rated at 600 volts or less, the short-circuit protective device can be set at not more than ____ percent of this value.

A. 100 B. 200 C. 300 D. 400

Trades & Technology

Braced or post and ____________________ construction is similar to platform except that larger timbers are used and spread at greater intervals.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Arrange in chronological order the United States' acquisition of (A) Oregon, (B) Texas, and (C) California.

A. A, B, C B. C, B, A C. B, A, C D. B, C, A E. A, C, B

Trades & Technology

____________________ switches are noncontact-type switches that are used to sense the presence or absence of an object without actually contacting the object.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology