When determining what percentage of a crane's capacity is used during for lift, it is calculated by dividing the total lifted weight by the _____.
a. the crane’s capacity, multiplied by 100
b. the crane’s single-line pull, multiplied by 100
c. the load block’s parts of line, multiplied by 100
d. operating radius, multiplied by 100
a. the crane’s capacity, multiplied by 100