Demolition debris from a construction site _____.

a. can be used for fill in the construction area
b. should be recycled if possible
c. must be sent to the landfill
d. should be burned daily


Answer: B

Trades & Technology

You might also like to view...

Ray’s hydraulic lift contains 33/5 gallons of hydraulic fluid. A damaged seal leaked 1 1/3 gallons of fluid while in use. How much fluid remains in the lift?

What will be an ideal response?

Trades & Technology

The business plan and ________ make up the core of a company "arch."

A. Cash flow B. Balance sheet C. Revenue model D. Story

Trades & Technology

Corners are usually marked with an ____ (I.P.) or some permanent feature.

A. ink pen B. interpolation point C. iron particle D. iron pin

Trades & Technology

Technician A says that during a power balance test, the cylinder that causes the biggest RPM drop is the weak cylinder. Technician B says that if one spark plug wire is grounded out and the engine speed does not drop, a weak or dead cylinder is indicated. Who is right?

A) Technician A only B) Technician B only C) Both technicians A and B D) Neither technician A nor B

Trades & Technology