Available capacity planned to exceed capacity required is:
A) alternate capacity. B) theoretical capacity.
C) safety capacity. D) infinite capacity.
C
You might also like to view...
When laying the first course, spread a solid bed of mortar and do not furrow, also known as _____, the mortar bed joint.
A. groove B. level C. reduce D. build up
An electronically shifted overdrive automatic transmission is equipped with a transmission fluid temperature sensor. Technician A says that the shifts may be changed if the fluid temperature is too high. Technician B says that overdrive may be disabled if the transmission fluid temperature is too high. Which technician is correct?
A) Technician A only
B) Technician B only
C) Both technicians A and B
D) Neither technician A nor B
The total approximate gravity load on a floor in a typical wood frame residential building is
A) 10 psf. B) 30 psf. C) 50 psf. D) 5 psf. E) none of the above.
Cam chucking is controlled with the use of a ________
A) Thrust plate B) Chuck gear C) Variable length bolt D) Shim