The shop has an air conditioning (A/C) machine that takes 0.8 hr to recharge a vehicle’s system. For an 8 hour work day what is the maximum number of A/C jobs that could be scheduled?

A. 1
B. 8
C. 10
D. 12


C. 10

Trades & Technology

You might also like to view...

Despite numerous technological advances, heavy equipment still requires an operator who is physically large and strong for its operation

Indicate whether the statement is true or false

Trades & Technology

What equipment must come with the delivery of every emergency vehicle?

A) Five-point seat harnesses B) On-spot chains C) Automatic external defibrillators (AED) D) Life belts

Trades & Technology

Including the 6% tax on parts, what is the total cost of the estimate?

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

ASE-Style Multiple Choice While having a discussion, Technician A says that when installing fenders, you should hand-start all of the fender bolts and tighten them. Technician B says that you should leave the bolts loose enough so that you can adjust the fender. Who is correct?

A. A only B. B only C. Neither A nor B D. Both A and B

Trades & Technology