The shortened term ____ is the most common term used by industry to denote a WPS.

A. welding schedule
B. welding parameters
C. welding specifications
D. welding procedures


Answer: D

Trades & Technology

You might also like to view...

What is needed to check for blow-by on a semi-hermetic compressor?

a. A set of gauges to check the difference between suction and discharge pressure. b. Compare the oil pump discharge pressure to the suction pressure. c. An access fitting on the crankcase to compare its pressure to the suction pressure.

Trades & Technology

Which of the following was NOT among the features of the increasing domestic anti-communist uproar in the late 1940s and early 1950s?

A. The Federal Bureau of Investigation successfully prevented the Soviets from stealing American atomic secrets. B. Two American citizens, Julius and Ethel Rosenberg, were executed as Soviet spies. C. The House Un-American Activities Committee successfully exposed the State Department's Alger Hiss as a Communist agent. D. Radical and liberal voices in unions, universities, churches, and civic institutions were muzzled. E. Teachers and other employees in many states were forced to sign loyalty oaths.

Trades & Technology

If a set of blueprints has a scale of 1/8 inch = 1 foot, a wall that is actually 17 feet long will be __________ long on the blueprint.

a. 1-7/8 inches b. 2-1/8 inches c. 2-1/4 inches d. 4-1/4 inches

Trades & Technology

A mat of reinforcing bars used in a slab is usually supported above the subgrade at a distance of _____.

a. 3 inches b. 4 inches c. 5 inches d. 6 inches

Trades & Technology