What is a reason for analyzing the cycle time of a piece of equipment?


a. It determines how fast the heavy equipment operator can drive.
b. It establishes the equipment's scheduled maintenance interval.
c. It provides important documentation about operator safety.
d. It allows the contractor to estimate how long a job will take.


d. It allows the contractor to estimate how long a job will take.

Trades & Technology

You might also like to view...

_____ have irregular oval and round dark spots on the upper body, which give them a leopard-like appearance

a. Northern cricket frogs b. Leopard frogs c. Leopard toads d. Tree frogs

Trades & Technology

Levees are formed along river banks where coarse materials are deposited

Indicate whether the statement is true or false.

Trades & Technology

Which of the following is NOT a physical resource?

a. Raw materials b. A robotic welder c. Labor used in production d. An inventory of finished goods e. An office building

Trades & Technology

What is the difference between schedule 40 and schedule 80 iron pipe?

What will be an ideal response?

Trades & Technology