What are some of the costs associated with building never before seen robot?

What will be an ideal response?


Someone has to buy parts to build the robot from and the higher the torque or
precision of the robot, the higher the part cost. If the group needs specialty parts
this could mean cost in prototyping the parts as well as getting them made. Since
they are creating a robot, they have to either find a controller that works for their
application or create that as well, another expense to factor in. The cost of
replacement parts for anything damaged during the building or testing process
also figures into the total bill.

Trades & Technology

You might also like to view...

A symbol, located in the field, legend, or margin of a sheet, with a system of ordered marks at fixed intervals used for measurement is called a______

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

A small quantity of water is drained from a water separator equipped with a WIF sensor that has produced no service alert. Immediately after, a WIF alert is signaled. What should you do first?  

A. Replace the water separator B. Replace the WIF sensor C. Check the fuel tanks for water D. Clean the WIF probes

Trades & Technology

Technician A says that a pickup coil (pulse generator) can be tested with an ohmmeter. Technician B says that ignition coils can be tested with an ohmmeter. Who is right?

A) Technician A only B) Technician B only C) Both technicians A and B D) Neither technician A nor B

Trades & Technology

A multiplexer has parallel data input and serial data output

Indicate whether the statement is true or false

Trades & Technology