Fully describe the welds required to join part number 1 to part number 4.
Refer to the girder brace in Drawing Number W11784S R1.
3/8?? intermittent fillet welds, 3 inches long on 6 inch centers on the front of the Girder Brace; 3/8?? intermittent fillet welds, 2 inches long on 7 inch centers on the back of the Girder Brace
You might also like to view...
When semiconductor materials are refined into a pure form, the molecules arrange themselves into a crystal structure with a definite pattern. This type of pattern is called a(n) ____________________ structure.
Fill in the blank(s) with the appropriate word(s).
Load-chart capacities limited by stability when on outriggers are based on which percentage of tipping load by test?
a. 1 percent b. 50 percent c. 75 percent d. 85 percent
A vapor barrier material that is applied over wall studs and ceiling joists after insulation is installed is _____
a. aluminum foil b. house wrap c. rigid foam board d. polyethylene film
Technician A says that spool valves may be controlled hydraulically or electrically. Technician B says that spool valves can be controlled manually or pneumatically. Who is correct?
A. Technician A only B. Technician B only C. Both A and B D. Neither A nor B