The steel frame of a pre-engineered structure can be erected quickly because it is assembled with _____.


a. pins
b. rivets
c. welds
d. bolts


d. bolts

Trades & Technology

You might also like to view...

The ____________________ makes sure the schedule is maintained and that meetings do not run over the allotted time.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Service-entrance and overhead service conductors shall be arranged so that ____.

A. lightening rods will extend above them B. water shall not enter the service raceway or equipment C. sealed service head is not exposed D. the main body is supported by rigid masting

Trades & Technology

Explain what manufacturers mean by a register's throw?

What will be an ideal response?

Trades & Technology

The process for the linear takeoff of duct insulation is the same to the ductwork takeoff of sheet metal.

Answer the following statement true (T) or false (F)

Trades & Technology