An inspection of cable bundles running up the tower assembly should always include: mounting hardware, insulation damage, and weight.

Answer the following statement true (T) or false (F)


False

Would be difficult to weigh the bundles during a PM activity.

Trades & Technology

You might also like to view...

Asking yourself, “What reasonable and logical assumptions can I make and yet obtain an appropriate solution?” is a part of which step in a basic engineering problem solution?

a. Defining the problem b. Simplifying the problem c. Performing the solution or analysis d. Verifying the results

Trades & Technology

When is the O terminal energized on most low-voltage thermostats?

A) Whenever the thermostat calls for cooling B) Whenever the system switch is moved to "Heat" C) Whenever the thermostat calls for first stage heat D) Whenever the system switch is moved to "Cool"

Trades & Technology

When you are overtaking other highway users-an automobile, another rig, a bicyclist, or a pedestrian-it is safest to

A. assume that they do not see you B. honk your horn loudly C. wave them to the side of the road D. all of the above

Trades & Technology

The labor and material payment bond protects _________________________ in the event of default by the contractor

Fill in the blank(s) with correct word

Trades & Technology