The active region of a JFET that lies between the pinch-off and breakdown voltages of a JFET is called the
A) constant-current region B) load line
C) ohmic region D) inverse resistance region
A
You might also like to view...
The maximum recommended size of a dual-element, time-delay fuse for a 50hp, 460V, threephase motor rated at 65 FLA is _____.
a. 80A b. 100A c. 110A d. 125A
Technician A says that a voltage drop test of the charging circuit should only be performed when current is flowing through the circuit. Technician B says to connect the leads of a voltmeter to the positive and negative terminals of the battery to measure the voltage drop of the charging system. Which technician is correct?
A) Technician A only B) Technician B only C) Both technicians D) Neither technician
The least costly time to fix a drawing error is while it is in the ____________________ department.
Fill in the blank(s) with the appropriate word(s).
Ajinkya Electronic Systems, a company in India that manufactures many different electronic products, has to purchase goods and services from a variety of suppliers (wire, diodes, LED displays, plastic components, etc.). The table below shows several suppliers and the VAT tax rates associated with each. It also shows the purchases (in $1000 units) that Ajinkya made (before tax) from each supplier in the previous accounting period. Assume Ajinkya’s sales to end users were $9.2 million and Ajinkya’s products carry a 15% VAT.
What was the total amount of VAT collected by the Treasury of India from Ajinkya and Ajinkya’s suppliers?