Which of the following is the term applied to a master schedule for a purchased item?

A) master scheduling B) material scheduling
C) supplier scheduling D) purchase order


D

Trades & Technology

You might also like to view...

Identify the statement that is false.

A. The triangular trade was enormously profitable and made up most of the colonial commerce. B. A trader would leave New England with a cargo of rum and sail to the Gold Coast of Africa. C. A trader would barter rum with African chiefs for captured African slaves. D. A trader would travel to the West Indies with the African slaves for molasses. E. A trader would travel to New England with the molasses, where it would be distilled into rum.

Trades & Technology

A newer type of glove material is made from carbon, which provides resistance to solvents and improves flexibility

Indicate whether the statement is true or false

Trades & Technology

PVC solvent will normally work with:

A) Either PVC or CPVC pipe. B) Polybutylene pipe. C) PVC pipe only. D) CPVC pipe only.

Trades & Technology

Using the reciprocal key on a calculator, the reciprocal of 4 is:

A. 4.0 B. 4.4 C. 0.4 D. 0.25

Trades & Technology