During each of the five days in one week, a civil drafter worked 8.75 hours, 9.25 hours, 7.5 hours, 9.75 hours, and 7.5 hours. How many hours did the drafter work for the five days?
What will be an ideal response?
42.75 hours
You might also like to view...
Once a thorough understanding of the client's lifestyle, design criteria, and financial limits has been developed, the ____ studies can begin.
A. final B. preliminary C. objective D. prelude
In the set of data below, determine the 40% percentile.2 7 9 12 16 19 21 2425 32 41 58 62 65 67 6972 74 75 77 78 79 81 8487 88 90 92 93 95 98 99101 125 131 133 147 149 150 165
Fill in the blank(s) with the appropriate word(s).
What is the main difference between Type L and Type ACR copper tubing?
A. Type ACR is shipped from the factory already cleaned and dried with sealed ends. B. Type ACR is thinner walled. C. Type ACR comes in soft-temper coils only. D. Type ACR comes in hard-temper lengths only.
A(n) ____________________ diagram provides more detail than the block diagram by showing the individual components of a circuit using schematic symbols and how they are interconnected in a circuit.
Fill in the blank(s) with the appropriate word(s).