Anchor bolts projecting from a footing or slab are accurately positioned by using a _____
a. builder's level
b. template
c. plumb bob
d. steel tape
b
You might also like to view...
The underlying sketch shows components of a glass-aluminum curtain wall. Using leader lines and labels, identify the following components: (i) vision glass, (ii) spandrel glass, (iii) vertical and horizontal pressure plates, and (iv) vertical and horizontal covers. How are the covers anchored to mullions and rails?
What will be an ideal response?
. When applying duct insulation with the adhesive method, how far apart should strips of adhesive be applied around the outside of a duct?
a. 6 inches b. 8 inches c. 10 inches d. 12 inches
A set of contacts actuated by a bimetal strip with a low-voltage wire wrapped around it is called a(n) ____________________.
Fill in the blank(s) with the appropriate word(s).
How should root substrate be prepared prior to applying steam or chemicals for pasteurization?
What will be an ideal response?