The proper height for lifting should place the work area ________

A) Over the technicians head B) Near the floor
C) At chest level D) None of these


C

Trades & Technology

You might also like to view...

What tools would be used to measure crankshaft warpage?

A. straightedge and feeler gauge B. dial caliper and V-blocks C. dial indicator and V-blocks D. dial bore gauge and outside micrometer

Trades & Technology

Name the member that is located on top of the studs and is used to hold the wall together:

What will be an ideal response?

Trades & Technology

otors that are intended to operate with variable voltage are designed with ____________________ stators.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Lifetime Savings Accounts, known as LSAs, allow people to invest after-tax money without being taxed on any of the gains. If an engineer invests $10,000 now and $10,000 each year for the next 20 years, how much will be in the account imme­diately after the last deposit, provided the account grows by 10% per year?

What will be an ideal response?

Trades & Technology