The correct order of application for a roof installation at an eave is _____.
a. underlayment, starter strip, finish roof material, and drip edge flashing
b. starter strip, drip edge flashing, underlayment, and finish roof material
c. drip edge flashing, starter strip, underlayment, and finish roof material
d. drip edge flashing, underlayment, starter strip, and finish roof material
Answer: D
You might also like to view...
Describe the purpose and organization of NIOSH
What will be an ideal response?
The protocols defining the pin outs of the connector, the gauge of cable, the number of twists per foot, the distance the signal travels, the voltage levels, and the frequency range, among other things, are the:
A) physical layer protocols B) network layer protocols C) data link layer protocols D) all of the above
Walls generally average about ___ psf.
A. 5 lb B. 10 lb C. 25 lb D. 50 lb
How do you check system performance during the heating cycle?
A) Consult system pressure charts for indoor and outdoor temperatures. B) Recharge the system with the correct amount of refrigerant. C) Attach a low-pressure gauge to the vapor line. D) Recharge the system using a heating performance check chart.