What is the total load required by the NEC® for two appliance branch circuits plus a laundry branch circuit?
a. 1,500VA
b. 3,000VA
c. 4,500VA
d. 6,000VA
c. 4,500VA
1,500VA x 2 for branch circuits + 1,500VA for laundry = 4,500VA
You might also like to view...
Calculate aggregate per capita electricity use for the least developed nations as well as low-income, middle-income, and OECD nations (see Table 8.1). What do these variations suggest about the capacity of these nations for economic development?
What will be an ideal response?
Pruning saws have long handles to give more leverage for cutting larger branches
Indicate whether the statement is true or false
Answer the following statement(s) true (T) or false (F)
1. A sound level meter measures the sound pressure level of a source. 2. Dynamic range represents the maximum span between the loudest and softest level of sound. 3. The velocity of sound decreases at temperature increases. 4. The threshold of hearing is set to 0dB. 5. 0dB represents a complete absence of sound.
What time in the day are most cut flowers harvested and why?
What will be an ideal response?