ACCA's Manual J:

A) Provides detailed procedures for installing air-conditioning equipment.
B) Is a national best practices overview for system installation.
C) Provides a complete list of board jumper locations.
D) Is used for determining the heat gain of a residential structure.


D

Trades & Technology

You might also like to view...

A(n) ____ joining process is one that is completely performed by hand.

A. semiautomatic B. manual C. machine D. automatic

Trades & Technology

A transistor can ____________

A) Switch on and off B) Amplify C) Throttle D) Do all of the above

Trades & Technology

In an optoisolator, a ____ is used to trigger a phototransistor.

a. light-emitting diode b. transistor c. rectifier d. rheostat

Trades & Technology

A datum is established on a cast surface by a "flag" or a symbol.

Answer the following statement true (T) or false (F)

Trades & Technology