A(n) ____________________ plan is prepared by the architect or structural engineer and shows the footings, foundation walls, and any items that support the structure.
Fill in the blank(s) with the appropriate word(s).
ANSWER: foundation
You might also like to view...
Provide the distances shown as A through E for questions 1 through 5.
1. Distance A = ______________
2. Distance B = ______________
3. Distance C = ______________
4. Distance D = ______________
5. Distance E = ______________
Maintain grounding continuity in a cable tray system by connecting the motor to the cable tray system using _____.
a. flexible metal conduit b. a plastic dropout tray c. an outside vertical riser d. 90° horizontal elbow
How do most manufacturers prefer technicians prime secondary fuel filters?
A. After installation using the priming pump. B. After installation by hand. C. Before the primary filter. D. Pre-charged before installation.
What type of material comprises a coil spring?
What will be an ideal response?