The information in a modern county soil survey report is generally used to ________ when designing a construction project
A) locate favorable sites
B) draw up the design plans for building foundations
C) indicate areas that require more intense on-site investigation than others
D) replace laborious on-site soil investigation
E) both A and C
E
You might also like to view...
When OSHA fines organizations for safety violations, where does the money go?
A) Wherever Congress determines B) To OSHA executives and employees as bonuses and salary enhancements C) To the U.S. treasury D) Divided with state-level OSHA programs
A recent graduate who wants to start an excavation/earth-moving business is trying to determine which size of used dump truck to buy. He knows that as the bed size increases, the net income increases, but he is uncertain whether the incremental expenditure required for the larger trucks is justified. The cash flows associated with each size truck are estimated below. The contractor has established a MARR of 18% per year, and all trucks are expected to have a remaining economic life of 5 years. (a) Determine which size truck he should purchase. (b) If two trucks are to be purchased, what should be the size of the second truck?
Technician A lifts a heavy load using leverage away from his body. Technician B lifts a load keeping it close to his body. Which technician is correct?
A) Technician A only B) Technician B only C) Both technicians A and B D) Neither technician A nor B
An air conditioner with refrigerant R-410a has a high-side pressure of 340 psig and a temperature of 95°F. According to the pressure-temperature chart:
A) It is saturated. B) It is superheated. C) It is subcooled. D) Its condition cannot be determined knowing just the pressure and temperature.