Under the terms of the contract it has with the owner, the prime contractor is always held responsible for the performance of the work, excluding the performance of the work done by subcontractors.

Answer the following statement true (T) or false (F)


False

Trades & Technology

You might also like to view...

An electric motor under steady load draws 9.7 amperes at 110 volts, delivering 1.25(hp) of mechanical energy. What is the rate of heat transfer from the motor, in kW?

What will be an ideal response?

Trades & Technology

The number of U.S. hog operations has _____, and the average inventory per farm has continued to ______

a. declined/decline c. increased/decline b. increased/increase d. declined/increase

Trades & Technology

Find the complex power for the following cases:

Trades & Technology

Carry the answer to three decimal places. If W=3.000 inches, Y=1.750 inches, and Z=0.875 inch, find X.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology