What is meant by live load chilling?

A) The thermal storage system is being recharged for later use
B) The load is met by water chiller operation, providing cooling as needed
C) Neither the chiller nor the thermal storage system are required because the load is cooling itself in economizer mode
D) The load is met by the thermal storage system


B