Calculate the work done by the force F along the path C.F = 7xi - 5x4y2j + (-7z - 5y2)k ; the path is  where C1 is the straight line from  to   C2 is the straight line from (1, 0, 0) to (1, 1, 0), and C3 is the straight line from (1, 1, 0) to (1, 1, 1)

A. W = 
B. W = 
C. W = - 
D. W = - 


Answer: C

Mathematics

You might also like to view...

Provide an appropriate response.Solve the equation by factoring: 3x2 - 2x - 5 = 0

Fill in the blank(s) with the appropriate word(s).

Mathematics

Solve.When an object is dropped to the ground from a height of h meters, the time it takes for the object to reach the ground is given by the equation t = , where t is measured in seconds. Solve the equation for h. Use the result to determine the height from which an object was dropped if it hits the ground after falling for 3 seconds.

A. h = 24.01t B. h = 24.01t2 C. h = 4.9t2 D. h = 4.9t

Mathematics

If m?A+m?B+m?ACB =180°, what is the measure of each angle?

Mathematics

Solve the problem.The water in a tank weighs 875.98 lb. One cubic foot of water weighs 62.5 lb. How many cubic feet of water are in the tank?

A. 54,748.750 cubic feet B. 0.07135 cubic feet C. 938.48 cubic feet D. 14.01568 cubic feet

Mathematics