This is a prerequisite for a 5G capable UE before it can carry out capability transfer signaling in an Option 3x (EN-DC) deployment.
A. The NR RRC Connection must be established between this UE and the gNB.
B. Initial cell selection must be done with a gNB.
C. An LTE RRC Connection must be established between this UE and the eNB.
D. An IP address must have been assigned by the P-GW.
Answer: C. An LTE RRC Connection must be established between this UE and the eNB.
You might also like to view...
The wire size is determined by the ____ rating of the circuit.
a. voltage b. ampere c. reactance d. turns ratio
The wipers operate properly in the manual mode, but not in the automatic mode. Technician A says the problem may be caused by a fault in the bus network. Technician B says the problem may be caused by a faulty rain sensor module. Who is correct?
A. Technician A only B. Technician B only C. Both Technician A and B D. Neither Technician A nor B
Farmers can be denied farm program benefits if they are not in compliance with specified conservation practices
Indicate whether the statement is true or false
The brake pedals on a two-wheel-drive tractor must be locked together when the tractor is driven at speeds over _____
A) 5 mph B) 15 mph C) 10 mph D) 30 mph