Identify the seven principles of reengineering.(1) ________(2) ________(3) ________(4) ________(5) ________(6) ________(7) ________

What will be an ideal response?


(1) organize around outcomes, not tasks; (2) have those who use the output of the process perform the process; (3) merge information-processing work into the work that produces the information; (4) treat geographically dispersed resources as though they were centralized; (5) link parallel activities instead of integrating their results; (6) put the decision point where the work is performed and build control into the process; (7) capture information once, at the source

Business

You might also like to view...

What is the probability that x is less than 5, given the function below? f(x) = (1/10) e-x/10     x 0

A. 0.6065 B. 0.0606 C. 0.3935 D. 0.9393

Business

Which of the following stages of team development is marked by optimal performance levels?

a. Forming b. Norming c. Performing d. In an effective team, all stages are marked by peak performance

Business

Which of the following questions is not a part of The Framework for Ethical Decision Making?

A) How will others be affected by my decision? B) How likely am I to be discovered doing something unethical? C) How will I feel after the decision is known? D) Is this action legal? E) Is this decision in line with my personal values?

Business

The upper and lower control limits for a component are 0.150 cm. and 0.120 cm., with a process target of .135 cm. The process standard deviation is 0.004 cm. and the process average is 0.138 cm. What is the process capability index?

A) 1.00 B) 1.25 C) 1.50 D) 1.75

Business