Which of the following is the most critical for proper walk-in installation?
a. That the floor panels are level before the wall and door panels are attached.
b. That the box uses urethane insulation to help maintain the proper temperature.
c. That the condensing unit is close to the walk-in for efficient operation.
a. That the floor panels are level before the wall and door panels are attached.
You might also like to view...
Which of the following cmvs are most likely to get stuck at a raised railroad crossing
a. moving van b. lowboy c. car carrier d. all of the above
Energy sources that cannot be replenished are called:
A) Nonrenewable energy sources. B) Renewable energy sources. C) Perpetual energy resources. D) Refillable energy sources.
One pound-foot is greater than one newton meter
Indicate whether the statement is true or false
Tri-state outputs include ________ state in which logic low is at ground potential
Fill in the blank(s) with correct word