Solve the problem.A contractor mixes concrete from bags of pre-mix for small jobs. How many bags with 6% cement should he mix with 5 bags of 18% cement to produce a mix containing 12% cement?

A. 7 bags
B. 5 bags
C. 15 bags
D. 10 bags


Answer: B

Mathematics

You might also like to view...

Convert the units.9.84 m =  cm

A. 98.4 cm B. 984 cm C. 0.984 cm D. 0.0984 cm

Mathematics

Find the area of the triangle. Approximate values to the nearest tenth when appropriate.Legs with lengths 9 ft and 9 ft

A.  ft2
B. 162 ft2
C. 18 ft
D. 81 ft2

Mathematics

Find the integral.

A. 3e(3x - 9x2) + C
B. 3(1 - 6x)e(3x - 9x2) + C
C. (1 - 6x)e(3x - 9x2) + C
D. e(3x - 9x2) + C

Mathematics

Graph the inequality.xy ? 2 

A.

B.

C.

D.

Mathematics