In using the formula for "Cost of Quality" if the job is completed correctly and meets the customer's expectation the cost of PONC would be zero

Indicate whether the statement is true or false


TRUE

Trades & Technology

You might also like to view...

When would we use qualitative information instead of quantitative information? Give an example.

What will be an ideal response?

Trades & Technology

PLC solid-state outputs are not available in the ________

A) Current sinking mode B) Totally isolated configuration C) Current sourcing mode D) High current mode

Trades & Technology

A collision repair center’s damage estimator is decoding a VIN. Which of the following will the estimator NOT be able to obtain from that number?

A. The original manufacturer of the vehicle B. Where and when the vehicle was built C. The type of transmission the vehicle is equipped with D. The type of restraint system the vehicle has installed at the factory

Trades & Technology

ASE-Style Multiple Choice Which of the following statements is LEAST-Likely true?

A. Most weld-through primers have poor adhesion qualities. B. Epoxy primer is sprayed on in the same way as other primers. C. Weld through primers contain acids that eat into the metal to produce better adhesion. D. Two-part epoxy primers are recommended by most automobile makers in place of the standard primer.

Trades & Technology