In a column splice detail, a butt plate is required when
A) the upper-story column is much larger in height than the lower-story column.
B) the upper-story column is much smaller in height than the lower-story column.
C) the upper-story column has the same cross-sectional dimensions as the lower-story column.
D) the upper-story column is the same height as the lower-story column.
E) none of the above.
E) none of the above.
You might also like to view...
If you want to improve your net profit, which of the following should you do?
A) Increase income B) Decrease expenses C) Both A and B D) Neither A nor B
The use of container-grown plants has remained about the same for the past few decades
Indicate whether the statement is true or false.
Guess the location of the points of inflection in each span in Figure P13.2. Compute the values of moment at supports B and C, and draw the shear and moment curves. EI is constant.
Case 1: L 1 = 3 m
Case 2: L 1 = 12 m
Check your results by using moment distribution.
What are some differences between piping practices for air conditioning systems and piping practices for commercial refrigeration systems?
What will be an ideal response?