The ____ is ultimately responsible for the design of the facility to meet occupancy needs and must ensure that the products being installed are suitable to meet these needs.
A. contractor
B. designer
C. architect
D. fabricator
Answer: B
You might also like to view...
14. In the accompanying diagram, what do part A and part B show?
What will be an ideal response?
Which of the following is not one of the best practices for a team entering the prototyping phase?
A. Try to create a virtual prototype, which are dynamic and cost less B. Have a minimum awesome product before starting to prototype C. Carry multiple product concepts into the prototyping phase D. Use rapid prototyping to aim for a minimum viable product
Determine the windows needed for the Real Estate Office in Appendix E. Using the labor rates from Problem 7-31 and the crew rate for the finish crew from Problem 7-32 determine the cost for the windows and storefronts.
The following data can be extracted from the model:
A block is 8.335" thick. Three rough cuts of 0.451" each and one finish cut of 0.012" are machined from the block. What is the remaining thickness of the block in inches?
What will be an ideal response?