Explain how post-tensioned steel slabs on grade are created.

What will be an ideal response?


Construction of post-tensioned slabs on grade uses high strength reinforcing steel placed inside plastic ducts with tension anchors located in pockets embedded into the slab edge. Once the concrete pour has gained sufficient strength, usually after two to three days, the tendons are stressed. After stressing, the tendon ends are cut off and the anchor pockets filled with grout to protect them from corrosion.

Trades & Technology

You might also like to view...

What is the name of the tone produced by the paging system that repeatedly ascends from low to high?

A. WHOOP B. HI-LO C. WAIL D. HORN

Trades & Technology

List four reasons why low voltage controls are usually found on residential air conditioning systems?

What will be an ideal response?

Trades & Technology

For castings or other parts that have irregular surfaces, these are often used to establish the position of the part for manufacturing or inspection purposes:

A. Datum planes B. Datum targets C. True positions D. Form tolerances

Trades & Technology

Parking brakes are used to hold a vehicle stationary after it has been stopped by the service brakes.

Answer the following statement true (T) or false (F)

Trades & Technology