When planning for disasters, it is important to first identify those systems that are:
A) outsourced.
B) legacy systems.
C) highly technical.
D) mission critical.
D
You might also like to view...
Which of the following is a key characteristic of a probability sample that determines the sample size of a population?
A) the number of chances a result occurs as planned B) the permissible sample error that can be allowed C) the inability to statistically project the results to the entire population D) the similarity in the sample characteristics being measured
A class diagram shows the dynamic structure of an object-oriented model
Indicate whether the statement is true or false
A company asked one of their analysis team to analyze and create models that help decide whether they should manufacture a particular product or outsource its production. The different components are given below
Fixed Cost, FC = $25,000
Material Cost per Unit, MC = $2.15
Labor Cost per Unit, LC = $2.00 Outsourcing Cost per Unit, O = $4.50
?
- Build an influence diagram that illustrates how to calculate the difference in cost of manufacturing and outsourcing.
- Using mathematical notation, construct a mathematical model for calculating the difference in cost of manufacturing and outsourcing.
- Implement your model from part (b) in an Excel spreadsheet model using the principles of good spreadsheet design.
- Using the spreadsheet model, what will be the resulting savings due to outsourcing if the company wants to make 30,000 units of a particular product?
_____ is a temporary holding area for the information you're working with as well as the system and application software instructions that the CPU currently needs.
A. ROM B. RAM C. DVD D. VCD