High-rise apartment and office buildings with light floor loads are often constructed using _____.
a. one-way solid slabs
b. two-way joist slabs
c. two-way flat plate slabs
d. composite slabs
c. two-way flat plate slabs
You might also like to view...
Before the deck (framing and subfloor or concrete slab) has been completed, the framing carpenter has already laid out the location of walls and partitions.
Answer the following statement true (T) or false (F)
Refer to Figure P2.4 for the floor plan. Calculate the tributary areas for (a) floor beam B3, (b) floor beam B4, (c) girder G3, (d) girder G4, (e) edge column C3, and (f ) corner column C4.
Two technicians are discussing the term "turbo lag." Technician A says that it refers to the delay between when exhaust leaves the cylinder and when it contacts the turbine blades of the turbocharger. Technician B says the term refers to the delay in boost pressure that occurs when the throttle is first opened. Which technician is correct?
A) Technician A B) Technician B C) Both technicians D) Neither technician
For a given frequency, the capacitive reactance decreases with _____
a. decreasing capacitance b. increasing capacitance c. decreasing inductance d. increasing inductance