Which technique may be used to shorten the construction time by overlapping the design and construction phases?

A. Fast-track construction
B. Predesigned construction
C. Design-build construction
D. Prefabricated construction


Answer: A. Fast-track construction

Trades & Technology

You might also like to view...

If proximity detectors are used in areas that contain metal shavings or dust, an effort should be made to do what?

What will be an ideal response?

Trades & Technology

When performing load calculations for farm buildings, the load that must be included in the calculation at 100% demand must be at least _____.

a. 30A b. 60A c. 120A d. 240A

Trades & Technology

Fats are predominantly diglycerides, and oils are predominantly triglycerides

Indicate whether the statement is true or false

Trades & Technology

Technician A says that in an open center circuit the hydraulic pump is rested (unloaded)when flow is not required by the actuator. Technician B says that in a closed-center circuit, the hydraulic pump runs continuously. Who is correct?

A. Technician A only B. Technician B only C. Both A and B D. Neither A nor B

Trades & Technology